Tripscha DigitalBook a call

How long does it take to build a website?

With a standard scope, a Tripscha Digital website goes live four to six weeks after signing. Before that come the intro call (30 minutes) and the prototype, which you see before any price is named. The schedule starts once your copy and photos are in. Further down, you can work out your own dates from today. As of October 2026.

What happens in the weeks ahead, counted from today.

Choose when the intro call should be, how big the site will be and what material is already there. The schedule counts in working days.

Example for a call next week, 6 to 12 pages, photos are missing.

Intro call
Size
Material

Dates count from the day of your enquiry and fall on working days.

  1.  next week

    Intro call

    30 minutes, by video or in Villingen-Schwenningen. We listen and tell you whether and how we can help.

    Together

  2.  + 7 days

    You see your prototype

    Your site, built from your material, clickable. Only now does a price come into it.

    Tripscha Digital

  3.  + 3 days

    Fixed price and signature

    A written fixed price. Nothing goes live without your approval.

    Together

  4.  Week 1to week 2

    Concept and design

    Structure, design and copy, worked out with you. While material is still coming in, this takes 2 weeks.

    Tripscha Digital

  5.  Week 3to week 6

    Development

    You see the progress every week and approve each milestone.

    Tripscha Digital

  6. online6 to 7 weeksafter signing

    Sign-off and launch

    Final polish and your sign-off, then the site goes live.

    Together

All dates fall on working days.

If that is your schedule: book an intro call

Missing material and late approvals push back the date.

The schedule starts once your copy and photos are in. If something is missing, the launch moves back. The schedule above takes this into account.

The same goes for approvals: before anything goes live, you approve the design and the finished site. The next step starts after your OK.

  • Copy and photos are ready

    Launch as planned.

  • Photos are missing

    Launch one week later.

  • Nothing prepared yet

    Launch two weeks later.

Faster means a smaller scope, never skipping the prototype.

Weeks from signature to launch, once copy and photos are in

  • Up to 5 pages

    4 to 5 weeks to launch.

  • 6 to 12 pages

    5 to 6 weeks to launch.

  • More than 12 pages

    6 to 8 weeks to launch.

Even when time is short, the prototype stays the first step. We name the price only once you have seen your site.

For more than 12 pages, we set the scope and schedule together in the call.

What the prototype is

What a finished site looks like: one of our websites.

The boxing gym gives its name and location right at the top, backs up its experience with facts and leads to a single goal: the trial session.

Homepage of KK Boxing, a website for a boxing gym in Villingen-Schwenningen, screenshot on desktop

KK BoxingVillingen-SchwenningenOpen site

One screen says who trains here, where, and how to get started. A boxing gym run by an active professional boxer.

  1. Name and place

    Name and place as a statement: who this is and where, without scrolling.

  2. Credentials

    Credentials as facts: 130 amateur bouts, national team, professional since 2022. No adjectives.

  3. Trial session

    Visitors have one clear next step: the trial session. The same button sits top right in the header.

An example from our portfolio: KK Boxing.

One conversation, then you see your site.

Intro call: 30 minutes, by video or in Villingen-Schwenningen. Then we build your prototype, and only then comes the fixed price.

Earliest intro call: one working day after your enquiry